In Akersberga, approximately 30 km from Stockholm, Mabudo is building two modern villas with a usable area of 250 and 260 m2 and two detached garages using prefabrication technology.
A significantly shortened project implementation time and a price known at the beginning of the investment are just two of the many advantages of the technology of building prefabricated houses.
Completion of construction work is one of the final moments on the way to moving into a building. However, it is not the definitive end of the undertaking itself, which is building a house.
When planning to build your dream home, you must first obtain the appropriate documents, permits and a project, as well as submit the appropriate notifications.
If you are afraid of building a single-family house using the traditional method and want to abandon this idea, it means that you have not yet come across Mabudo Rapid®. Discover the innovative construction system that will allow you to…
Prefabricated roofs are becoming more common and are delivered to the construction site as ready-to-assemble elements that do not require additional processing. What are prefabricated roof trusses and is it a better solution than others currently on the market?
In order to gain knowledge about what may be built in the future on the land we buy, we should reach for the MPZP, or local spatial development plan. How to read this legal act? How to interpret it?
Even the best visualization of a building must be adapted to local regulations and the shape of the plot. Ready-made designs, also called typical or repeatable designs in the meaning of construction law, are not considered construction designs.
Due to lower costs and shorter investment implementation time, prefabricated houses from ready-made elements enjoy huge interest. A good example of this is the wide range of ready-made prefabricated house designs Mabudo. Check out what we have to offer in…
Prefabricated houses are becoming increasingly popular. These buildings are cheaper and faster to build than houses built in the traditional system. If you familiarize yourself with the Mabudo offer, you will see that a prefabricated house can also be very…
If we want to build a house, as a rule, we must obtain a permit from the relevant state administration bodies. According to the construction law in force in Poland, it is possible to start construction work without a building…
At the beginning of January 2022, regulations came into force, under which, with a similar formal path, you can build a single-family house up to 70 m², ground floor or with an attic, for your own housing needs. Check what…
Are you getting ready to build a family nest? Don’t invest in outdated construction solutions – electricity costs are rising year by year, so it’s worth thinking about the future today! And the future is our energy-efficient prefabricated layered houses…
Although it seems that modular and prefabricated houses assembled into one whole are the same, there are some differences between the two technologies. Which of the methods of implementing a housing investment should you choose?
Do houses for registration up to 70 m² actually involve a potential risk of threat to the safety of construction and use of the building? What other concerns do investors have?
Building a home is the biggest investment in most people’s lives. The costs of such an undertaking are a big challenge, and everyone would like to move into their own home as soon as possible. Fortunately, there are several good…
The main assumption is a zero-energy house. A solution that is a symbol of today’s times in the construction industry. Private investors want to minimize the costs of operating the house, while maintaining the highest comfort of living in every…
Building a house is one of the most important life decisions. We usually don’t know where to start when it comes to formal or technical issues. However, we know in what aspects we want to provide our family with a…
MAB020 is a modern, single-family, 4-room, bungalow house with an area of 83.13 m2. In 2020, it was one of the most frequently chosen projects by Investors. MAB020 has its larger counterpart MAB021.
The investment was carried out on the basis of the MAB007 project in Hermanów, Pabianice commune, on the plot of the investor, who is a developer. The scope of works performed by MABUDO included the construction of foundations, external walls…