We prepare the application for filing
You get the complete documentation for the building permit application – you file it with the authority, and we follow the case until the decision.
We adapt the design to your plot and local regulations, prepare the complete documentation for the application, and once it's filed we follow the case at the authority until the building permit decision. The service is part of building with MABUDO – the design can come from our catalog or from elsewhere.
Formalities usually take longer than construction itself – so we start on day one after the contract is signed.
You get the complete documentation for the building permit application – you file it with the authority, and we follow the case until the decision.
You provide the maps, zoning documents, geotechnical surveys and declarations – we check them and complete the documentation the authority requires.
We adapt your catalog design to your plot and local building regulations.
We settle everything that's needed and keep you posted on progress.
Adaptation isn't cosmetic – it's the full set of changes and approvals without which the authority won't issue a permit.
Foundations for the actual soil, wind and snow loads, ground level, access roads, and conformance with the zoning plan or conditions decision.
Water, sewage, electricity, gas and telecom – we obtain the technical conditions for your plot.
Interior layout, windows and doors, adjustments to plumbing and electrical installations. Very unusual changes, e.g. additional installations, may require an extra fee.
Building placement, access paths, driveways, parking spaces and utility connections.
We check the design against current construction regulations.
Architectural-construction design, site development design and every required appendix.
The sooner you send the full set, the sooner we start the adaptation. Missing something? Your advisor will help you gather it.
You have 7 days from signing to deliver the full set.
Up to 12 weeks from receiving the full set of documents.
You have 3 business days for comments – we apply fixes within 10 business days.
Within 5 working days of accepting the finished adaptation – with the complete set of documents you receive from us.
A statutory timeframe outside our control – we monitor the case and keep you posted.
PLN 3,000 advance after signing the contract · PLN 6,000 after the building permit decision is issued. Not included in the flat fee: the map for design purposes, the soil survey and the extracts you provide, and official fees for approvals and opinions. The contract provides that within 21 days of obtaining the permit you sign the construction contract for your house with us.
We don't sell this service separately – it is part of building with MABUDO. The design can be from our catalog, custom or external, and within 21 days of obtaining the permit we sign the construction contract.