Building permit?
We take care of it

We adapt the design to your plot and local regulations, prepare the complete documentation for the application, and once it's filed we follow the case at the authority until the building permit decision. The service is part of building with MABUDO – the design can come from our catalog or from elsewhere.

Talk to an advisorFor clients building their home with MABUDO
PLN 9,000flat fee for the adaptation and preparing the application
12 weeksto prepare the design adaptation
1 advisoron our side throughout the whole procedure
2 instalmentsadvance payment at the start, the rest after the decision
What we do for you

You file the application. Everything for it is prepared by us

Formalities usually take longer than construction itself – so we start on day one after the contract is signed.

01

We prepare the application for filing

You get the complete documentation for the building permit application – you file it with the authority, and we follow the case until the decision.

02

We check and complete the documents

You provide the maps, zoning documents, geotechnical surveys and declarations – we check them and complete the documentation the authority requires.

03

We prepare the design adaptation

We adapt your catalog design to your plot and local building regulations.

04

We coordinate the whole process

We settle everything that's needed and keep you posted on progress.

Adaptation scope

What the design adaptation covers

Adaptation isn't cosmetic – it's the full set of changes and approvals without which the authority won't issue a permit.

01

Adjusting to local conditions

Foundations for the actual soil, wind and snow loads, ground level, access roads, and conformance with the zoning plan or conditions decision.

02

Utility connection conditions

Water, sewage, electricity, gas and telecom – we obtain the technical conditions for your plot.

03

Changes you request

Interior layout, windows and doors, adjustments to plumbing and electrical installations. Very unusual changes, e.g. additional installations, may require an extra fee.

04

Site development plan

Building placement, access paths, driveways, parking spaces and utility connections.

05

Compliance with building law

We check the design against current construction regulations.

06

Full application documentation

Architectural-construction design, site development design and every required appendix.

What you prepare

Documents you send us within 7 days of signing

The sooner you send the full set, the sooner we start the adaptation. Missing something? Your advisor will help you gather it.

Purchased catalog design (or an external one, per its licence)
Current survey map for design purposes
Zoning conditions decision or an excerpt from the local zoning plan
Document confirming your right to use the property for construction
Geotechnical soil survey
Land and building register excerpt
Road manager's consent for a driveway – if it applies to your plot
Technical conditions for utility connections – if you already have them
Step by step

From signing to the permit decision.

01

You sign the contract and send the documents

You have 7 days from signing to deliver the full set.

02

We prepare the design adaptation

Up to 12 weeks from receiving the full set of documents.

03

You review and approve the adaptation

You have 3 business days for comments – we apply fixes within 10 business days.

04

You file the permit application

Within 5 working days of accepting the finished adaptation – with the complete set of documents you receive from us.

05

The authority issues its decision

A statutory timeframe outside our control – we monitor the case and keep you posted.

PLN 9,000 gross – flat fee for the whole service

PLN 3,000 advance after signing the contract · PLN 6,000 after the building permit decision is issued. Not included in the flat fee: the map for design purposes, the soil survey and the extracts you provide, and official fees for approvals and opinions. The contract provides that within 21 days of obtaining the permit you sign the construction contract for your house with us.

Ready for the formalities?

First the design, then we handle the rest

We don't sell this service separately – it is part of building with MABUDO. The design can be from our catalog, custom or external, and within 21 days of obtaining the permit we sign the construction contract.