About 4 years on average
According to Statistics Poland (GUS), building a single-family house takes about 4 years on average – from start to occupancy. Some of the work stops in winter.
We make the walls, floor slabs and roof trusses of your house in our hall in Zduńska Wola, to its own drawings and regardless of the weather. Finished, checked elements arrive on the plot – so the build is shorter and less is left to chance.
Designer, local authority, several crews and suppliers – each is responsible for their own piece, and you hold it all together, usually for the first time in your life. The plan changes along the way, under pressure from time and weather, and building a house becomes a second job.
According to Statistics Poland (GUS), building a single-family house takes about 4 years on average – from start to occupancy. Some of the work stops in winter.
Materials get more expensive along the way, the crew finds work that wasn't in the quote, corrections pile up. You cover the difference from your reserve or with an extra loan.
A Saturday call from the site manager, the plumber didn't show up, the door handles have to be chosen by tomorrow. Your days off belong to the site until you move in.
Around 4 months on site and around 6 months from contract to keys, not counting paperwork – because the walls are made in the factory while work is under way on the plot.
The same materials as on a traditional site – concrete, steel, insulation – just with the work organised differently. We make each wall whole in the hall instead of building it up layer by layer. The shorter time doesn't come from skipping steps, but from some of them happening in the factory.
Every wall has its own digital model. Windows, sockets, underfloor heating pipes and reinforcement are all drawn before production starts.
In Zduńska Wola we cast walls and floor slabs in moulds, using the concrete class specified in the design. Every element gets a dimensional check before it leaves.
The elements arrive on the plot ready: the walls stand in about 5 days and the roof structure in about 5 more. No bricklaying in the rain and no materials lying on site for weeks.
Structure, insulation and facade in one precast element. Click a layer to see its role and thickness, or open the full 3D model.
All three have a concrete structure from the same factory. They differ in facade, thickness and interior finish. We decide together which one to choose at the design stage.
A facade layer of structural concrete, insulation on the inside, a timber batten frame and a plasterboard finish. A lighter wall with easy routing of installations – at 36.25 cm it holds up to 23 cm of insulation.
Very good thermal insulation, easy routing of installations, a finished facade surface
MABUDO’s flagship technology for single-family housesConcrete on both sides, insulation in the middle. The outer layer is a finished concrete facade – smooth or with a texture pressed in the mould. A premium solution now available for catalogue houses.
High durability, very good acoustics, a solid structure and a finished concrete facade
A premium solution inspired by multi-family constructionA classic concrete wall with external insulation and a thin-coat external render. A lighter and thinner wall that keeps its thermal performance.
A simple layer build-up, a slim wall and good thermal performance
Technology for single-family houses with a classic layer build-upThe MABUDO wall next to timber frame, expanded clay concrete and modular technology. We compare five features that decide how the house feels to live in and what it costs to run.
| Feature | MABUDO · reinforced concrete | Timber frame | Expanded clay concrete | Modular technology |
|---|---|---|---|---|
| Durability | Very high, typically several decades | Strongly dependent on protection against moisture and pests and on build quality | High – the material resists moisture, mould and biological corrosion | Depends on the system and the quality of prefabrication |
| Thermal bridges | Kept to a minimum thanks to a well-designed layer build-up and technology | Moderate – occur mainly at timber studs and joints | Depend on joint details and technical solutions | Usually small thanks to repeatable factory details, but dependent on module joints |
| Acoustics | Very good – the large mass of the structure dampens sound effectively | Average – requires a suitable layer build-up, mineral wool and boards | Good – relatively high mass and a porous structure | Average, depends on wall construction and the quality of joints between modules |
| Heating cost | Low – U = 0.147 W/m²K as standard for the ECO wall, and high thermal mass stabilises the temperature | Low with well-insulated walls; low thermal inertia – the house heats up and cools down faster | Low; a good combination of insulation and heat storage | Low with a well-built, airtight system |
| Fire resistance | Very high – non-combustible material | Average – timber is combustible, although suitable cross-sections and protection can provide the required resistance | Very high – non-combustible material | Timber and steel modules require suitable fire protection |
START, PLUS and FINISH are not three levels of quality.
They are three levels of our responsibility. In each one you get the same walls from the same factory – the only difference is the point at which you take over the build.
Wall structure with a finished facade, necessary structural elements and roof trusses. You arrange roof covering, windows and the remaining work yourself. It's the cheapest package.
Included:Roof covering, windows and exterior doors are in place, and the house is closed. Your house can stand as it is, and you can do the interior whenever you want and with whoever you want.
Included:A house ready for finishing: services, plaster and screeds are done. What's left on your side is flooring, painting and sanitary fittings.
Included:In FINISH we usually design heating around a heat pump, heat recovery ventilation and underfloor heating. If you have gas, plan another source or the plot calls for it, we settle that during adaptation and adjust the services.
The most common setup in our homes: no gas boiler room, with the installation ready to run after handover.
When there is a gas network by the plot and this option makes technical sense.
For plots without gas, when the investor chooses an independent heat source.
When you want to base heating on biomass and have space to store the fuel.
Before we sign the contract, we need six documents about the plot. Gathering them is on your side – the sooner you start, the sooner production begins.
From the authority – county / city / municipal office
From a licensed surveyor
Water, electricity, gas or district heating
From the authority – when the plot has soil quality classes
3 boreholes 4 m – geologist recommended
Depending on the provisions in the conditions
The full guide includes contacts for recommended surveyors and geologists and a simple list of next steps.
Mr Mariusz Adamczyk – 15 years after completion
Mr Michał Jankowski – fixed contract price
Mr Daniel Grondzewski – full service under one roof
Mr Stanisław Adamczyk – comfort after years of use
Footage from two builds: a crane lifts the finished walls, the crew joins them on the foundation, and the roof trusses go on last.
Building the MAB001 house in concrete prefabrication
Assembly of the MAB007 structure in prefabrication
Three articles to start with. You'll find the rest in the Information center.
How the ECO, ROBUST and CLASSIC walls differ, and what parameters the partition achieves.
Recommended articleIs concrete prefabrication durable?Building conditions/zoning plan, building permit, adapting the design to the plot.
Recommended articleHow to obtain a permit to build a houseWhat the package price includes and how to finance a precast house.
Recommended articleHow much a precast concrete house costs35 designs from 73 to 390 m². The configurator shows the price in all three packages – no waiting for a quote.