PROMO IS LIVENew MABUDO. House designs for 499 złBrowse projects ENDS IN
––DAYS––HRS––MIN––SEC
…
MABUDO for business · Technologies

Not every investment should be
built the same way

You don't pick a system – you pick the goal of the investment. Based on the geometry, standard, budget, and schedule, we recommend the technology that best fits the project. In each of them, the delivery responsibility stays with us.

2D precast · 3D cross-section

Two walls,
one system

ECO and ROBUST answer different investment requirements. They differ in layer arrangement, how services are routed, and their parameter range. Click a layer to X-ray the cross-section.

MABUDO ECOU = 0.147 W/m²K · 36.25 cm
MABUDO ECO® wall · 3D detail
loading 3D model…
WebGL could not be started – the 3D model is unavailable in this browser. Update your browser or enable hardware acceleration.
ECOMABUDO ECO wall

Wall layers: L-shaped concrete, 5 + 18 cm graphite EPS, timber battens, vapour barrier and plasterboard.

Click to X-ray the layers

Housing estates and budget-conscious projects. A 36.25 cm two-layer wall: an outer reinforced-concrete layer that doubles as the facade, plus integrated insulation with a timber substructure ready for drywall. Shell construction with a finished facade – no separate insulation and facade stages.

U = 0.147W/m²K – wall thermal performance
36.25 cmwall thickness
~30%shorter cycle vs. traditional technology
MABUDO ROBUSTU = 0.14–0.23 W/m²K · ~32–40 cm
MABUDO ROBUST® wall · 3D detail
loading 3D model…
WebGL could not be started – the 3D model is unavailable in this browser. Update your browser or enable hardware acceleration.
ROBUSTMABUDO ROBUST wall

Sandwich wall: 6 cm façade concrete finished with façade paint, 18 cm graphite EPS and 14 cm load-bearing concrete; inside, thin-coat plaster ready for a skim coat.

Click to X-ray the layers

Multi-family buildings and premium developments. A ~32–40 cm three-layer wall: load-bearing layer + insulation + facade layer in a single precast panel. The facade – textured (e.g. Reckli matrices) or in body-tinted architectural concrete – is ready on installation day.

U = 0.14–0.23W/m²K – wall thermal performance
~32–40 cmwall thickness
≈3× fewertransports to site vs. cast-in-place
Complementary technology · UCUBER 3D

When the building should arrive
more finished

UCUBER complements 2D precast where a volumetric module makes more sense: repeatable, controlled, and largely finished before assembly.

UCUBER 3D module – 1UCUBER 3D module – 2UCUBER 3D module – 3UCUBER 3D module – 4

A volumetric module: the building arrives largely complete – finished and furnished at the factory. For projects where fast operational start-up and predictable cost matter most. A solution for functions where fast go-live, predictability, and less on-site work matter.

Hospitality · Workplaces · Back-of-house · Repeatable functions · Modular residential and service layouts

3 daysto install 13 homes (Marina Liptov)
86modules at the Someren park (43 apartments)
12 wks.turnkey sales office (Sales Office WV)
The best of both worlds · HYBRID

The speed of a module,
the durability of concrete

How HYBRID works
  • 2D precast (ECO/ROBUST) where structure is needed: residential bays, stairwells, floors.
  • UCUBER 3D modules where a ready-made function matters: bathrooms, back-of-house, repeatable units.
  • One process and one responsibility – design, production, and assembly on a single schedule.
Who it's for
  • Mixed projects – speed and durability. Combining 2D prefabrication (ECO/ROBUST) with UCUBER modules in a single investment. The most durable structure where you need it, the fastest start where a ready-made function matters – turnkey, in one process.
  • Scope through to full fit-out – the most durable building, fastest, turnkey.
Offsite → onsite

Technology doesn't end
at the wall

The biggest risk in precast isn't in the element itself. It's at the interfaces: design, production, transport, assembly, and trade coordination. We manage that interface as one team.

Design for production

Designing with production, transport, and assembly in mind from the start – before the first element is made.

Logistics without improvisation

Deliveries, the crane, the assembly sequence, and crew availability planned as one process, not separate orders.

One responsibility

We combine technology with contracting, instead of leaving the investor stuck between the designer, the manufacturer, and the site.

Technology selection

Tell us what you're building.
We'll match how

We'll analyze the design, schedule, and expected standard. We'll point you to the technology that best combines speed, cost, durability, and the real constraints of the site.