MABUDO for business · Projects

From individual homes
to entire estates

Selected projects in Poland, Sweden, Slovakia and the Netherlands. MABUDO Rapid® with ECO and ROBUST walls and UCUBER 3D modules across different scales and delivery scopes.

Selected projects · Poland

Challenge. Solution.
Result

Scope, technology and delivery of selected developments. Figures and durations relate to the projects described, not guaranteed results for every design.

Wola Village, Phase 1

Wola Village, Phase 1

Poland · Kraków · MABUDO ROBUST
Residential estate · 34 semi-detached buildings
Full general contracting · 12 scopes in one lump-sum contract

General contracting for an estate of 34 semi-detached buildings using MABUDO ROBUST walls. The precast panels combine structure, insulation and a Reckli-textured concrete facade. Production was coordinated with work on site.

34 / 68buildings / apartments in phase 1
7,700 m²usable residential floor area
1,244precast elements in this project
12scopes of work in the GC contract
Challenge

A complete estate – 34 buildings with infrastructure, roads and site development – delivered in two parallel phases, as a single contract with one point of execution responsibility. On top of that, difficult ground conditions solved with piling.

Solution

Full general contracting across 12 defined scopes, with the ROBUST three-layer precast wall and Reckli finish as the structural and facade core. Factory production running in parallel with earthworks on site.

Result

A completed estate with 7,700 m² of usable residential floor area. Precast walls provided structure, insulation and facade in one element. The general-contracting agreement also covered the other agreed works and site development.

Dobrzechów

Dobrzechów

Poland · Podkarpackie · MABUDO ROBUST · SCS38
Multi-family residential · 3 buildings · 5 storeys
General contracting for the shell with factory-made facade · 3 phases for one investor

Shell construction for three apartment buildings with ROBUST SCS38 precast walls: 14 cm load-bearing concrete, 18 cm graphite EPS and 6 cm facade concrete. Assembly of the first phase took place across autumn and winter.

17 wks.shell construction of phase I
6,737 m²usable residential floor area across phases I–III
232deliveries in this project
5 peopleregular shell-assembly crew
Challenge

Coordinating production, deliveries and assembly for three buildings. The first phase included autumn and winter work, taking site conditions into account.

Solution

ROBUST SCS38 three-layer walls with factory-applied facade and insulation, filigree slabs, precast balconies. Factory production running in parallel with site preparation, installation by a fixed 5-person crew.

Result

The shell of the first phase was delivered in 17 weeks. The investor also commissioned phases II and III. The stated duration applies to this phase and its scope of work.

Nisko

Nisko

Poland · Podkarpackie · MABUDO ECO
Single-family housing estate · 4 single-storey homes
Production, delivery and installation of the enclosed shell

Four single-storey houses based on one design: three standard versions and one mirrored layout. MABUDO ECO walls combine a concrete facade with insulation on the inside, alongside prefabricated roof trusses.

4houses in one development
163 m²floor area per house
652 m²combined floor area
~12 wks.from structural assembly to enclosed shell
Challenge

Coordinating production and work on four houses within one development. A repeated design enabled joint planning of deliveries and construction stages.

Solution

One repeatable design in the ECO two-layer wall, roof trusses, roofing, joinery and facade painting. Factory production running in parallel with the site, all homes installed in a single run.

Result

The four houses reached enclosed-shell stage in approximately 12 weeks from the start of structural assembly. The scope included roof covering, joinery and facade painting. This is the duration of this project, not a commitment for every design.

Projects · Europe

Made in Poland.
Delivered across Europe.

MABUDO Rapid® villas in Sweden and UCUBER 3D modular developments in Slovakia and the Netherlands. Production, delivery, assembly and fit-out scopes were tailored to each project.

Someren · UCUBER 3D modular development
ÅkersbergaSweden · Åkersberga

Åkersberga

MABUDO Rapid® · ROBUST wallsPremium villas
Production in Poland, transport and installation in Sweden

Two villas to a bespoke URBA SKY design, delivered using MABUDO Rapid®. ROBUST walls with architectural concrete were manufactured in Poland and delivered to Sweden. Logistics and the assembly sequence were tailored to the hillside site.

2villas to a bespoke design
102precast elements in this project
PL → SEmanufactured in Poland, assembled in Sweden
Marina LiptovSlovakia · Bobrovník

Marina Liptov

UCUBER 3DResort expansion
Module production, fit-out, furnishing and assembly

Expansion of the resort in Bobrovník with 13 year-round holiday houses using UCUBER 3D technology. Modules were finished and furnished in the factory to the agreed project specification, then transported and assembled on site.

13year-round holiday houses
655 m²combined floor area
3 dayson-site module assembly, not the entire project duration
Someren Holiday ParkNetherlands · Someren

Someren Holiday Park

UCUBER 3DModular holiday park
Production, fit-out and delivery of UCUBER modules

A rental holiday park with 43 apartments and approximately 2,200 m² of usable floor area. The design was adapted for UCUBER 3D modular technology. Modules were finished in the factory; assembly and site works formed subsequent delivery stages.

43apartments in the holiday park
~2,200 m²combined usable floor area
86modules forming the apartments
Your investment

Let's plan your development

An advisor will help define the scope of cooperation, select a technology and gather the information needed for an initial estimate.