PROMO IS LIVENew MABUDO. House designs for 499 złBrowse projects ENDS IN
––DAYS––HRS––MIN––SEC
…
MABUDO for business · Developers · General contracting · Investors

Your construction.
Moved to the factory

We design, manufacture, and assemble – in a single process. Fewer unknowns on the construction site. More control over cost, schedule, and quality.

35 yearsof concrete prefabrication
18 yearsof contracting
PL + EUprojects across European markets
100+B2B projects
8 countriesmarkets across Europe
Poland · Germany · Sweden · Belgium · Netherlands · United Kingdom · Czech Republic · Slovakia
Traditional construction vs precast

The risk ends
before the first excavator arrives

On a traditional site you learn the cost from the tender and the quality from the site. In our process, the decisions that drive cost are made on the model, not on the site.

Traditional construction
  • Design first, then tender. The budget is known too late to influence it.
  • Changes on site mean the budget or the standard slips.
  • Quality depends on the weather and crew availability – every building turns out a little different.
  • A dozen-plus trade contractors for the investor to coordinate.
MABUDO precast
  • Cost priced into the design, not discovered in a tender or on site.
  • Production and site prep run in parallel – the delivery schedule gets shorter.
  • Repeatable quality, because it comes from the factory – independent of the weather. Assembly only needs above-freezing temperatures.
  • One contract, one responsibility – up to 12 scopes of work in a single lump-sum contract.
One process · three steps

Design. Manufacture.
Assemble

Your construction starts in the factory. The schedule and budget are set before the foundations begin.

Step 01

Design

Architects and structural engineers design with production in mind from the start. The decisions that drive cost are made on the model, not on the site.

Step 02

Manufacture

The building's components are made in the factory, under controlled conditions – independent of the weather, with repeatable quality.

Step 03

Assemble

On the plot it's assembly, not construction. Faster, quieter, and cleaner than a traditional site – from shell to turnkey.

Technologies

Technology matched
to the building, not the other way around

Based on the geometry, standard, budget, and schedule, we recommend the technology that best fits the project.

MABUDO ECO
Housing estates and budget-conscious projects.
MABUDO ROBUST
Multi-family buildings and premium developments.
UCUBER 3D
Hospitality, workplaces, repeatable functions.
HYBRID
Mixed projects – speed and durability.
Projects · concrete numbers

From the factory –
to eight countries across Europe

Housing estates, multi-family buildings, premium villas, and modular facilities. Every project has numbers, not promises.

Wola Village, Phase 1Poland · Kraków

Wola Village, Phase 1

MABUDO ROBUSTResidential estate
Full general contracting · 12 scopes in one lump-sum contract
34 / 68buildings and apartments (types T1–T3)
7 700 m²total usable floor area on a ~1.75 ha plot
1 244precast elements (17,412 m² of 2D panels)
DobrzechówPoland · Podkarpackie

Dobrzechów

MABUDO ROBUST · SCS38Multi-family residential
General contracting for the shell with factory-made facade · 3 phases for one investor
17 wks.shell of phase I – on schedule
6 737 m²total usable floor area (phases I+II+III)
232deliveries instead of ~700 transports (≈3× fewer)
NiskoPoland · Podkarpackie

Nisko

MABUDO ECOSingle-family housing estate
Production, delivery and installation of the enclosed shell
~12 wks.from structural assembly to facade and joinery – 4 homes
4 × 163 m²homes from one repeatable design · 652 m² total
~30%faster than traditional construction (~12 instead of ~18 weeks)
Someren Holiday ParkNetherlands · Someren

Someren Holiday Park

UCUBER 3DModular holiday park
A complete accommodation base, ready for immediate use
43apartments · 86 modules
~2 200 m²total floor area
0fit-out work before operational start
Let's begin

Tell us about your investment

We'll analyze the design, schedule, and expected standard. We'll show what the investment would look like built with our method – with numbers, not promises.